When the River Runs Low: Climate Risks to Hydropower Reliability
From the air, the Julius Nyerere Hydropower Plant looks like a symbol of permanence: 2,115 megawatts of generating capacity, a…
From the air, the Julius Nyerere Hydropower Plant looks like a symbol of permanence: 2,115 megawatts of generating capacity, a…
It is just after dawn on the Rufiji River. Mist still clings to the water’s surface, but already the turbines…
The month of March marks a great victory for Tanzania and Africa as a whole in the fight for economic…