Close

The Invisible Infrastructure: Customs, Bureaucracy, and Digital Disconnect at Dar Port.

Dar Port bureaucracy
Share this article

When Renovation Isn’t Reform

In the shadow of new gantry cranes and deeper berths at the Dar es Salaam Port, an older, invisible force continues to stall progress: bureaucracy. While Tanzania has invested heavily in modernizing its port infrastructure, improving terminal capacity, expanding the Kwala Dry Port, and linking it to the Standard Gauge Railway, the experience of clearing a container still feels like navigating a maze drawn in the 1980s. For every vessel that docks faster, there are still containers that linger due to duplicated inspections, inconsistent fees, or inexplicable documentation delays.

One local importer put it bluntly: “The physical cargo moves, but the data doesn’t.” Despite the cranes and concrete, Dar Port’s operational speed continues to be throttled not by machines but by systems, legacy customs procedures, fragmented digital platforms, and agency silos that refuse to speak the same language.

Beyond Dredging and Cranes: The Governance Gap

The push to modernize Dar Port has succeeded in transforming its physical landscape. With DP World taking over berths 4–7 under a performance-based concession model, and TPA retaining oversight on key public assets, container handling capacity has improved. Ship turnaround times have started to drop. But as several logistics players have observed, the bottleneck has shifted, from sea to screen.

The core of the issue lies in institutional alignment. While TPA manages terminal operations, TRA handles customs, TBS inspects standards, and TRC oversees SGR cargo; each operates on different platforms with different protocols and decision logics. The result is a governance gap: physical assets modernize rapidly, but the soft infrastructure of coordination, system interoperability, and real-time data flow lags.

This disparity between visible upgrades and invisible dysfunction was a consistent thread across logistics forums and trader conversations. As one clearing agent put it: “You fix the port, but if TANCIS and TPA don’t update together, we’re stuck.” It’s a reminder that infrastructure is no longer just about steel; it’s also about code, clarity, and institutional chemistry.

Customs Redesign; System Unification

To its credit, Tanzania has made notable progress in customs reform. The Tanzania Customs Integrated System (TANCIS), introduced by TRA, is among the most comprehensive in the region. Similarly, the Port Community System (PCS), now being integrated through TPA and supported by TradeMark Africa, aims to consolidate port users into a single digital interface. Other upgrades, such as container scanning using the Next Generation Inspection (N-GEN) system, are intended to reduce inspection redundancy.

But the promise of automation has not yet translated into predictability. System downtime remains common, particularly during cross-agency handoffs. Importers have reported completing clearance in TANCIS, only to discover that their release status isn’t reflected in the PCS system used by TPA. When this happens, containers are flagged for re-inspection, even though clearance was already granted.

Even where digital systems function, their logic is often out of sync. For instance, cargo destined for Kwala may be flagged differently by TRA and TPA, resulting in mismatched scheduling and storage surcharges. Worse still, the lack of user-friendly dashboards or real-time helpdesks leaves agents relying on informal networks to resolve digital issues, reintroducing the very opacity the reforms aimed to remove.

Paper Trails and Pushbacks: Where Cargo Gets Held

Despite the digital sheen of modern systems, many traders still describe Dar es Salaam’s port processes as “paper-first, portal-second.” In theory, a shipment cleared in TANCIS should move seamlessly through the Port Community System (PCS) to TPA’s gates. In practice, discrepancies in cargo weight declarations, inspection flags, or misaligned payment references often trigger manual overrides.

Customs agents and traders alike report frequent incidents where containers are held due to minor data mismatches, differences in weight tolerances, inconsistent HS codes, or uncleared auxiliary fees like inspection charges or fumigation. These delays are not just technical; they’re expensive. Storage penalties accrue hourly, and for SMEs without buffer capital, these setbacks can erode profit margins entirely.

The fallback? Manual intervention, sometimes bordering on informal. Clearing agents often resort to hand-delivering physical documents to different agency offices or calling in favors to expedite clearance. One trader noted that, “the fastest part of my clearance was the WhatsApp group, not the government system.” This reliance on unofficial channels exposes a deeper trust deficit in the digital infrastructure and leaves the process vulnerable to rent-seeking behavior.

Digital Silos: No Single Source of Truth

At the heart of Dar port’s congestion lies a deceptively simple flaw: there’s no single source of truth for cargo data. A container may show as cleared in TANCIS, pending in PCS, and undetected in the Kwala Dry Port manifest system. This fragmentation causes paralysis; operators cannot release cargo, schedule rail transport, or plan trucking logistics because the systems don’t align in real time.

The root cause is twofold. First, the systems were developed by different agencies at different times, each optimized for its mandate, revenue collection, port flow, standard enforcement, or transport scheduling. Second, there’s a lack of transparent integration governance. While TRA and TPA technically cooperate under the Ministry of Finance and Planning, there’s no binding performance protocol to ensure system synchronization or shared service-level benchmarks.

For traders, the implications are acute. If a container’s digital status isn’t harmonized across systems, it may be offloaded but not inspected, or inspected but not scheduled for rail. These mismatches waste valuable time, strain intermodal connectivity with Kwala and SGR, and erode the competitive edge Dar port seeks against rivals like Mombasa.

Who Benefits Must Be at the Table

System inefficiencies are rarely technical alone; they’re also political and institutional. The rollout of PCS, TANCIS upgrades, and integration with SGR schedules have been largely state-driven, with limited structured input from end-users like clearing agents, logistics firms, and cross-border traders. This top-down approach, while expedient, has left key stakeholders out of the design and feedback loops.

The consequences are clear. Poor user interface design, lack of real-time dashboards, inadequate training for SME agents, and non-responsiveness to error tickets all point to systems not built around actual users. Moreover, major decisions, such as shifting full container clearance to Kwala, were introduced without structured simulation or pilot feedback from importers.

This disconnect has sparked low-level resistance, including traders holding cargo at the port instead of transferring it to Kwala, agents delaying digital filing until physical confirmation is made, and a reversion to manual processes when systems glitch. It’s not sabotage, it’s survival. Until traders and agents are treated as co-developers, not just end-users, reform will be partial and fragile.

Blueprint for Reform:  A Fully Integrated Clearance Ecosystem

Fixing Dar Port’s congestion problem is no longer a matter of building more berths or adding scanners. The next frontier is software, not just digital tools, but digital governance. Tanzania now has the physical infrastructure to become the region’s top port. Still, it needs a clearance system that treats time as capital, data as infrastructure, and users as co-creators.

This reform blueprint would begin with establishing a Unified Cargo Status Dashboard, a live, cross-platform portal accessible to all licensed traders, showing clearance stages across TRA, TPA, TBS, and TRC in real-time. This dashboard should not be a separate app, but an API-powered overlay that aggregates data already collected by existing systems.

Second, there is an urgent need for Service-Level Agreements (SLAs) between agencies, defining time limits for clearance stages and making each stage auditable. For example, if TRA completes clearance, PCS must reflect that status within 30 minutes, or trigger a system flag for escalation.

Third, introduce a trader-facing digital helpdesk with real-time chat support and automated ticketing. The current protocol, filing complaints via forms or phone calls, falls short for a system where delays cost money every hour.

Finally, the reform must institutionalize user testing and feedback loops. A trader advisory group, with rotating representatives from clearing firms and SMEs, should be integrated into the oversight architecture of PCS and other clearance tools. Without this, system design will remain disconnected from operational realities on the ground.

Fixing the Code Before Cutting the Ribbon

Tanzania’s ambition to position Dar es Salaam as East Africa’s most efficient logistics hub is real and commendable. The cranes are in place. The berths are deeper. The SGR line runs to Kwala. But if the digital infrastructure remains fragmented and the governance around clearance remains opaque, we risk modernizing the port in form, but not in function.

The next wave of port modernization will not be visible in cement or steel. It will happen in system logs, inter-agency protocols, and the lived experience of a trader checking their container status from a mobile phone. It will require humility from public institutions, inclusiveness in digital design, and an unflinching view of what’s not working.

Because in the end, a port is not a place, it’s a promise. A promise that goods can move, that systems can speak, and that time won’t be lost to silos, no crane can lift.

🔗 Missed Day 2? Read Kwala Dry Port – Tanzania’s Inland Bet to Decongest Dar

Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Leave a comment
0
Would love your thoughts, please comment.x
()
x
scroll to top